Vihara FoundationPOWERED BY YIELDWISEFoundation website ↗

Resource 09 / 12

Government Scheme Directory

Prepare a documented eligibility assessment before budgeting assistance.

Download this kit

How to use this directory

This is a starting directory, not a live list of open applications. The sources were researched for this edition dated 24 September 2026. Verify the current application window, geographical coverage, implementing agency, sanction conditions and available budget directly. Being a Producer Company does not automatically qualify an applicant, and incorporation should not be sold on a promise of subsidy.

Formation and promotion of 10,000 FPOs — SFAC

Purpose: formation, capacity building and support under the central programme. Route: check the implementing agency/CBBO and SFAC operational guidelines. Eligibility and assistance depend on admission to the programme and component-specific requirements. Prepare incorporation and member records, producer evidence, business plan, capital receipts and audited information as required. Management support, equity support and credit guarantees are distinct components; a guarantee is not a cash grant to the FPO. Confirm the current guideline and whether the company is within the supported cohort.

Agriculture Infrastructure Fund

Purpose: financing eligible post-harvest and community farming infrastructure. FPOs are among the eligible applicant categories, but the project, lender assessment and scheme conditions matter. Prepare a DPR, quotations, site documents, permissions, funding plan and repayment projections. Check the current sanction/disbursement window, eligible project list and conditions for interest support or guarantee. Historical programme periods do not establish that new applications remain open in September 2026.

PMFME — group/common infrastructure

Purpose: support qualifying micro-food-processing and common infrastructure proposals. FPO applications require project and scheme eligibility, State nodal routing where applicable, a viable DPR, member/group details, premises, bank appraisal and own contribution. Check the common-use conditions and current application window with the State nodal agency. Convergence with another scheme must follow both sets of rules; do not claim the same eligible cost twice without an expressly permitted structure.

NABARD and market access

NABARD producer-organisation support may combine institution building, credit facilitation, capacity building and market linkage through specific programmes or partners. Ask the regional office which current route fits the company; it is not a universal direct grant. e-NAM is a market-access platform: assess onboarding, commodity/mandi availability, quality and settlement arrangements. Classify it as a service opportunity, not a subsidy. State agriculture, horticulture and food-processing programmes require a separate State-specific search.

Application and post-sanction controls

Make an eligibility memo with the exact guideline version, project cost, eligible cost, applicant contribution, lender contribution and proposed support. Obtain approvals and disclose other assistance. After sanction, maintain a separate project ledger, invoices, bank trail, procurement evidence and utilisation reports. Record milestones and clawback conditions. Recognise grants in the accounts using the applicable framework; a sanction letter is not unrestricted income.

Worked example · fictional facts

Example: For a ₹20 lakh grading project, list quotations, land/premises rights, licences, member throughput and buyer evidence before approaching the lender. Record proposed assistance as conditional until eligibility and sanction are confirmed. If two schemes appear relevant, obtain written confirmation of permissible convergence before including both in the finance plan.

Editable tools

Open a tool, complete the yellow fields and save a completed copy. For offline use, download this kit first. No entries are uploaded or automatically saved. These tools are adapted worksheets, not prescribed statutory forms.

Related register formats

Sources and further reading

Read legal references with amendments and current Rules. Scheme windows and application availability are not confirmed by inclusion here. The case-law module explicitly identifies the verification limits of its reported example.